Title:
|
Northside Hall Task Force Report 2 |
Other Titles:
|
Report 2 |
Author:
|
Indiana University South Bend. Northside Hall Task Force |
Keywords:
|
Indiana University South Bend -- Buildings; Northside Hall (South Bend, Ind.) |
Date:
|
2020-02-15 |
Publisher:
|
Indiana University South Bend |
Abstract:
|
Our second report is both a follow-up and a sequel to that initial report. The current report is a follow-up because most of the problems detailed in the initial report--problems with building infrastructure, problems with building environment, and problems with general-inventory classrooms--are still major concerns. This second report is also a sequel because we introduce prioritized “needs/wants/wishes” lists for most of the departments and campus units that operate within Northside Hall. |
Location:
|
https://hdl.handle.net/10333/13094
|
Type:
|
Other |