Northside Hall Task Force Report 2
Loading...
Date
2020-02-15
Journal Title
Journal ISSN
Volume Title
Publisher
Indiana University South Bend
Abstract
Our second report is both a follow-up and a sequel to that initial report. The current report is a follow-up because most of the problems detailed in the initial report--problems with building infrastructure, problems with building environment, and problems with general-inventory classrooms--are still major concerns. This second report is also a sequel because we introduce prioritized “needs/wants/wishes” lists for most of the departments and campus units that operate within Northside Hall.