Northside Hall Task Force Report 2
dc.contributor.author | Indiana University South Bend. Northside Hall Task Force | |
dc.date.accessioned | 2021-10-29T17:26:21Z | |
dc.date.available | 2021-10-29T17:26:21Z | |
dc.date.issued | 2020-02-15 | |
dc.description.abstract | Our second report is both a follow-up and a sequel to that initial report. The current report is a follow-up because most of the problems detailed in the initial report--problems with building infrastructure, problems with building environment, and problems with general-inventory classrooms--are still major concerns. This second report is also a sequel because we introduce prioritized “needs/wants/wishes” lists for most of the departments and campus units that operate within Northside Hall. | en_US |
dc.format.extent | 43 pages | |
dc.format.mimetype | ||
dc.identifier.uri | https://hdl.handle.net/10333/13094 | |
dc.language.iso | en_US | en_US |
dc.publisher | Indiana University South Bend | en_US |
dc.subject.lcsh | Indiana University South Bend -- Buildings | |
dc.subject.lcsh | Northside Hall (South Bend, Ind.) | |
dc.title | Northside Hall Task Force Report 2 | en_US |
dc.title.alternative | Report 2 | en_US |
dc.type | Other | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- NS_Taskforce_Report_2.pdf
- Size:
- 840.01 KB
- Format:
- Adobe Portable Document Format